Review Agenda Item
Meeting Date: 2/27/2017 - 7:00 PM
Category: Consent Agenda
Type: Action
Subject: 15.21 (Item #22) Architectural and Engineering Services Contract with PHd Architects Inc. for Bleacher System Replacement at Concord High School
LCAP (Local Control Accountability Plan) Goal:
Strategic Initiative 5.3 Optimal Operations and Infrastructure
Ensure that our facilities and infrastructure support and enhance student learning and safety.
Policy:
Enclosure
File Attachment:
01 - MISA0109-PHD 02-27-17.pdf
02 - PHD_Certificates_of_INSURANCE_thru 2017.pdf
Summary: On June 4, 2012 the Board of Education approved facility enhancement projects for Concord High School. As a result of savings on previous projects and un-used contingencies, the site identified improvement within the existing gymnasium as a high priority facility enhancement project.
One improvement identified new bleacher system with expanded capacity. To facilitate this improvement, District staff is recommending approval of a professional services contract for engineering and architectural services required to secure DSA approval for replacement bleacher system at Concord High School.

Staff negotiated, and is now recommending, that a 'not to exceed' contract in the amount of $16,300.00 be awarded to PHd Architects for comprehensive engineering, design and contract administration services necessary for approval and satisfactory completion of the proposed project.

The scope of services includes work required to remove existing and install new telescoping bleacher systems with enhanced capacity (i.e. electrical and fire alarm). As well as work to meet compliance with Access Code, Fire Protection and T-24 regulations.
Funding: Measure C
Fiscal Impact $16,300.00
Recommendation: Approve the Award of Architectural and Engineering Services Contract to PHd Architects Inc., for Bleacher System Replacement at Concord High School.
Approvals:
Recommended By:
Signed By:
Debbie Maher - Sr. Administrative Executive Assistant to the Superintendent
Signed By:
Dr. Nellie Meyer - Superintendent
Vote Results:

Original Motion
Member Linda Mayo Moved, Member Cheryl Hansen seconded to approve the Original motion 'Approve the Award of Architectural and Engineering Services Contract to PHd Architects Inc., for Bleacher System Replacement at Concord High School.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Linda Mayo     Yes
Joanne Durkee     Yes
Cheryl Hansen     Yes
Brian Lawrence     Yes
Debra Mason     Yes