Review Agenda Item
Meeting Date: 12/13/2023 - 6:00 PM
Category: Maintenance and Operations
Type: Action
Subject: 16.36 Review and Potential Approval of Asphalt Repair at Clayton Valley Charter High School
LCAP (Local Control Accountability Plan) Goal:
Goal 1:
All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and career.
Policy:
Enclosure ATC - Clayton Valley
File Attachment:
ATC - Clayton Valley.pdf
Summary: During school site safety assessments it was identified that we have potential slip, trip and fall safety issues at Clayton Valley Charter High School. In order to correct these hazards and avoid future liability the district requires the support from an outside vendor.

The scope includes removal and replacement of 3,500+ square feet of existing asphalt on the south side of B-wing.
Funding: RRMA
Fiscal Impact 51,749.28
Recommendation: Move to Approve Review Asphalt Repair at Clayton Valley Charter High School
Approvals:
Recommended By:
Signed By:
Melanie Koslow - Director of Maintenance and Operations
Signed By:
Adrian Vargas - Chief Business Officer
Signed By:
Dr. Adam Clark - Superintendent
Vote Results:

Original Motion
Member Cherise Khaund Moved, Member Keisha Nzewi seconded to approve the Original motion 'Move to Approve Review Asphalt Repair at Clayton Valley Charter High School'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Linda Mayo     Yes
Debra Mason     Yes
Cherise Khaund     Yes
Keisha Nzewi     Yes
Erin McFerrin     Yes