|
|
Meeting Date:
|
5/14/2025 - 6:00 PM
|
Category:
|
Maintenance and Operations
|
Type:
|
Action
|
Subject:
|
15.42 Review and Potential Approval to Enter into a Contract with All County Flooring through the California Multiple Award Schedule ("CMAS") Contract 4-24-11-1025 for Olympic High School
|
LCAP (Local Control Accountability Plan) Goal:
|
Goal 1: All students will receive a high quality education in a safe and welcoming environment with high expectations and rigorous instruction in the California State Standards that prepare them for college and career.
|
Enclosure
|
ACF Proposal - Olympic High School
4-24-11-1025
|
File Attachment:
|
|
Summary:
|
During assessment, it was identified that the concrete substrate at the Multi-Use Building at Olympic High School is failing, therefore creating large cracks in the flooring causing potential slip, trip and fall risk. In order to repair the concrete and subsequent flooring, staff is recommending contracting with All County Flooring. Their scope will include removal of the existing VCT flooring and mud underlayment, repair subfloor, installation of epoxy membrane, and installation of new flooring material.
|
Funding:
|
Health and Safety
|
Fiscal Impact
:
|
$127,525.92
|
Recommendation:
|
Move to approve to enter into a contract with All County Flooring through the California Multiple Award Schedule (“CMAS”) contract 4-24-11-1025.
|
Approvals:
|
Recommended By:
|
Signed By:
|
|
Marie Hill - Senior Secretary
|
|
Signed By:
|
|
Melanie Koslow - Executive Director, Maintenance and Operations
|
|
Signed By:
|
|
Adrian Vargas - Chief Business Officer
|
|
Signed By:
|
|
Dr. Adam Clark - Superintendent
|
|
|
|
|
|
|
|