|
Meeting Date:
|
|
Category:
|
Maintenance and Operations |
|
|
Type:
|
|
Subject:
|
16.36 Review and Potential Approval of Asphalt Repair at Clayton Valley Charter High School |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
Goal 1: All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and career.
|
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
During school site safety assessments it was identified that we have potential slip, trip and fall safety issues at Clayton Valley Charter High School. In order to correct these hazards and avoid future liability the district requires the support from an outside vendor. The scope includes removal and replacement of 3,500+ square feet of existing asphalt on the south side of B-wing. |
|
|
Funding:
|
|
Recommendation
|
Move to Approve Review Asphalt Repair at Clayton Valley Charter High School |
|
|
Approvals:
|
Recommended By: |
Signed By: |
 |
Melanie Koslow - Director of Maintenance and Operations |
|
Signed By: |
|
Adrian Vargas - Chief Business Officer |
|
Signed By: |
|
Dr. Adam Clark - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Cherise Khaund Moved, Member Keisha Nzewi seconded to approve the Original motion 'Move to Approve Review Asphalt Repair at Clayton Valley Charter High School'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Linda Mayo | Yes | Debra Mason | Yes | Cherise Khaund | Yes | Keisha Nzewi | Yes | Erin McFerrin | Yes | |
|
|
|
|
|
|