Agenda Item
Meeting Date:
12/13/2023 - 6:00 PM  
Category:
Maintenance and Operations  
Type:
Action  
Subject:
16.36 Review and Potential Approval of Asphalt Repair at Clayton Valley Charter High School  
LCAP (Local Control Accountability Plan) Goal:
Goal 1:
All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and career.
 
Policy:
 
Enclosure:
ATC - Clayton Valley  
File Attachment:
ATC - Clayton Valley.pdf
 
Summary:
During school site safety assessments it was identified that we have potential slip, trip and fall safety issues at Clayton Valley Charter High School. In order to correct these hazards and avoid future liability the district requires the support from an outside vendor.

The scope includes removal and replacement of 3,500+ square feet of existing asphalt on the south side of B-wing.
 
Funding:
RRMA  
Fiscal Impact:
51,749.28  
Recommendation
Move to Approve Review Asphalt Repair at Clayton Valley Charter High School  
Approvals:
Recommended By:
Signed By:
Melanie Koslow - Director of Maintenance and Operations
Signed By:  
Adrian Vargas - Chief Business Officer
Signed By:  
Dr. Adam Clark - Superintendent
 
Vote Results:

Original Motion
Member Cherise Khaund Moved, Member Keisha Nzewi seconded to approve the Original motion 'Move to Approve Review Asphalt Repair at Clayton Valley Charter High School'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Linda Mayo     Yes
Debra Mason     Yes
Cherise Khaund     Yes
Keisha Nzewi     Yes
Erin McFerrin     Yes