|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
18.3 Review and Potential Approval of the Construction Amendment #1 Revisions to Existing Design-Build Agreement with Schneider Electric |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
Goal 1: All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and career. Goal 3: Parents, family, and community will be informed, engaged and empowered as partners with Mt. Diablo Unified to support student learning and achievement.
|
|
|
Enclosure:
|
MDUSD Design Build Amendment 1 Revisions
Schneider Electric - March 22 MDUSD Board Meeting Presentation
FAQs |
|
|
File Attachment:
|
|
Summary:
|
In response to RFQ 1896 for District-Wide Building Automation Heating, Ventilation, and Air Condition (HVAC) Systems and Lighting, staff brought forward the Public Hearing for the consideration of Resolution 21/22-49, authorizing a District Wide Design-Build Energy Services Project on February 2, 2022.
The District and Contractor came to an agreement and the Design-Build Agreement was approved on April 27, 2022 for Energy Service Projects.
On May 11, 2022, staff brought forward Construction Amendment #1 to existing Design-Build Agreement with Schneider Electric.
Staff is now bringing for Amendment #1 Revision which will amend and restate the Notice to Proceed to include the original contact, Project Scope #1 LED Lighting and now to include Project Scope #2 to include the controls and non-DSA HVAC equipment replacement scope.
Staff and contractor have successfully completed the audit/design effort for Project Track 2 for Controls and Non-DSA HVAC Equipment Replacement on units over 17 years old, where complete buildings can be completed. This effort included a District-Wide control and HVAC equipment audit, design collaboration, product review and construction planning/scheduling. Additionally, contractor worked with multiple subcontractors to negotiate the best pricing and schedule, on behalf of District.
Within Project Scope #2, the contractor will provide turnkey construction services to continue the HVAC Controls not included in the Prop 39 HVAC Controls Projects and replace 249 non-DSA HVAC Equipment, over 17 years or older, Districtwide. |
|
|
Funding:
|
|
Fiscal Impact: |
Project Scope #1 (Previously Approved) $24,354,012.00
Project Scope #2 (Requesting Approval) $25,074,659.00 |
|
|
Recommendation
|
Move to approve the Construction Amendment #1 revisions to existing Design-Build Agreement with Schneider Electric. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Melanie Koslow - Director of Maintenance and Operations |
|
Signed By: |
|
Elizabeth McClanahan - Director of Purchasing and Warehouse |
|
Signed By: |
|
Cesar Alvarado - General Counsel |
|
Signed By: |
|
Dr. Lisa Gonzales - Chief Business Officer |
|
Signed By: |
|
Dr. Adam Clark - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Linda Mayo Moved, Member Debra Mason seconded to approve the Original motion 'Move to approve the Construction Amendment #1 revisions to existing Design-Build Agreement with Schneider Electric.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Linda Mayo | Yes | Debra Mason | Yes | Cherise Khaund | Yes | Keisha Nzewi | Yes | Erin McFerrin | Yes | |
|
|
|
|
|
|