13.23 (Item #24) Final Change Order L/LB 1675-001 (DEDUCTIVE) to Robert A. Bothman Construction, Inc. for L/LB #1675 – Athletic Facility Improvements at Mt. Diablo High School  
LCAP (Local Control Accountability Plan) Goal:
Strategic Initiative 5.3 Optimal Operations and Infrastructure
Ensure that our facilities and infrastructure support and enhance student learning and safety.
 
Policy:
 
Enclosure:
 
File Attachment:
01 - FCO 1675-001 - MDHS Field 9.28.15.pdf
 
Summary:
On May 4, 2015, the Board of Education awarded Lease/Leaseback Agreement #1675 to Robert A. Bothman Construction, Inc. for construction of Athletic Facility Improvements at Mt. Diablo High School for a guaranteed maximum cost of $2,115,898.10.00 and provision of all tools, materials, labor and equipment necessary to complete construction/installation of synthetic track and field components at Mt. Diablo High School.

As a result of unused contract contingency, a single, final deductive change order in the amount of <$90,335.48> is necessary. This single, final change order will result in a final revised contract value of $2,025,562.62 and represents a decrease of 4.27% to original contract value.
 
Funding:
2010 Measure C  
Fiscal Impact:
<$90,335.48> DEDUCTIVE  
Recommendation
Approve Final Change Order L/LB 1675-001 (DEDUCTIVE) to Robert A. Bothman Construction, Inc. for L/LB #1675 – Athletic Facility Improvements at Mt. Diablo HS.  
Approvals:
Recommended By:
Signed By:
Tim Cody - Program Manager
Signed By:  
Dr. Nellie Meyer - Superintendent
 
Vote Results:

Original Motion
Member Moved, Member seconded to approve the Original motion 'Approve all Consent Agenda items.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Debra Mason     Yes
Brian Lawrence     Yes
Cheryl Hansen     Yes
Barbara Oaks     Yes
Linda Mayo     Yes