15.37 (Item #37) Notice of Completion of RFQ 1719: Flooring Improvements at Various Sites |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
Strategic Initiative 5.3 Optimal Operations and Infrastructure Ensure that our facilities and infrastructure support and enhance student learning and safety.
|
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
RFQ 1719 was called to provide flooring improvements at Concord High School, Sequoia Elementary, Bancroft Elementary, and Administration. The lowest responsible bidder was Harry L. Murphy, Inc., for the bid award amount of $25,500.00.00. The scope of work includes, but was not limited to: furnish all labor, materials, and equipment for the installation of resilient tile flooring along with cove base. There was a deductive change order for ($1,840.00) at Sequoia Elementary due to scope of work was not required. There was an additive change order in the amount of $11,890.00 for flooring installation at Westwood Elementary D4, Foothill Middle School Library, and Mt. Diablo High School Book Room. Services for this project have been satisfactorily completed for a total expenditure of $35,550.00. |
|
|
Funding:
|
6210 - Capital Outlay & Facility Work |
|
|
Recommendation
|
Approve the Notice of Completion of RFQ 1713: Flooring Improvements at various sites. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Laura Warner - Administrative Secretary |
|
Signed By: |
|
Jeff McDaniel - Executive Director of Operations |
|
Signed By: |
|
Donald A. Velez - General Counsel |
|
Signed By: |
|
Dr. Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Moved, Member seconded to approve the Original motion 'Approve all Consent Agenda items.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 4 Nay: 0. | The motion Carried 4 - 0 | | | Linda Mayo | Yes | Cheryl Hansen | Yes | Barbara Oaks | Yes | Debra Mason | Yes | |
|
|
|
|
|
|