|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
14.26 (Item #26) Award of Bid #1765 – Roofing Replacement at Holbrook Elementary School |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
Strategic Initiative 5.3 Optimal Operations and Infrastructure Ensure that our facilities and infrastructure support and enhance student learning and safety.
|
|
|
Enclosure:
|
|
File Attachment:
|
|
Summary:
|
Bid #1765 was called to provide comprehensive roofing replacement at Holbrook Elementary School. District solicitation resulted in the receipt of seven bids with Joseph Murphy Construction, Inc., submitting the apparent low, responsible and responsive bid. The total contract recommendation is $617,500.00 and scope of work includes selective demolition, deck repair, drain boxes, and thermoplastic (singly-ply) roofing system and all finishes necessary per plans and specifications at the above site. |
|
|
Funding:
|
Routine Restricted Maintenance |
|
|
Recommendation
|
Approve Award of Bid #1765 – Roofing Replacement at Holbrook Elementary School to Joseph Murphy Construction, Inc. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Tim Cody - Program Manager |
|
Signed By: |
|
Robert Greathouse - Director - Maintenance & Operations |
|
Signed By: |
|
Sharon Ketcherside - Purchasing Consultant |
|
Signed By: |
|
Wayne Oetken - Business Services |
|
Signed By: |
|
Dr. Nellie Meyer - Superintendent |
|
|
|
|
|
Vote Results:
|
Original Motion | Member Cheryl Hansen Moved, Member Linda Mayo seconded to approve the Original motion 'Approve Award of Bid #1765 – Roofing Replacement at Holbrook Elementary School to Joseph Murphy Construction, Inc.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0. | The motion Carried 5 - 0 | | | Linda Mayo | Yes | Joanne Durkee | Yes | Cheryl Hansen | Yes | Brian Lawrence | Yes | Debra Mason | Yes | |
|
|
|
|
|
|