Agenda Item
Meeting Date:
9/8/2021 - 6:00 PM  
Category:
Maintenance and Operations  
Type:
Action  
Subject:
14.32 Review and Potential Approval of Design Service contract to Arch Pac, Inc. Design and Engineering Services for the College Park High School Swimming Pool Replastering Improvements  
LCAP (Local Control Accountability Plan) Goal:
Goal 1:
All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and career.
 
Policy:
 
Enclosure:
Arch Pac, Inc. Independent Service Contract  
File Attachment:
Arch Pac Inc Independent Services Contract Draft.pdf
 
Summary:
The professional services of an design engineer are necessary to provide planning, design, engineering, and consultation services for the College Park High School Swimming Pool Replacement Project. This design will to support district in replacing the existing 25yd by 25m pool plaster and all associated work including, but not limited to jurisdiction approval assistance. Staff negotiated a proposal in the amount of $33,000.00 to be awarded Arch Pac, Inc.  
Funding:
Measure C  
Fiscal Impact:
$33,000.00  
Recommendation
Approve the Design Service contract to Arch Pac, Inc. Design and Engineering Services for the College Park High School Swimming Pool Replastering Improvements  
Approvals:
Recommended By:
Signed By:
Melanie Koslow - Director of Maintenance and Operations
Signed By:  
Elizabeth McClanahan - Director of Purchasing and Warehouse
Signed By:  
Mika Arbelbide - Director of Fiscal Services
Signed By:  
Dr. Lisa Gonzales - Chief Business Officer
Signed By:  
Dr. Adam Clark - Superintendent