|
Meeting Date:
|
|
Category:
|
|
Type:
|
|
Subject:
|
14.44 Review and Potential Approval of Cabling and Wireless Access Point Installation at Five (5) Elementary Schools: Ayers Elementary, Fair Oaks Elementary, Silverwood Elementary, Woodside Elementary, and Ygnacio Valley Elementary |
|
|
LCAP (Local Control Accountability Plan) Goal:
|
Goal 1: All students will receive a high quality education in a safe and welcoming environment with equitable and high expectations, access to technology, and instruction in the California State Standards that prepare them for college and career.
|
|
|
Enclosure:
|
Ayers Elementary School AP Cabling Fair Oaks Elementary School AP Cabling Silverwood Elementary School AP Cabling Woodside Elementary School AP Cabling Ygnacio Valley Elementary School AP Cabling |
|
|
File Attachment:
|
|
Summary:
|
Five elementary schools are currently operating on significantly outdated wireless access points that utilize a different system from the current MDUSD standard. This project brings these five schools to the current access point standard and to our new cabling standard for access point installations. |
|
|
Funding:
|
AB86 / ESSER II / ESSER III |
|
|
Recommendation
|
Move to approve cabling and wireless access point installation at five (5) elementary schools: Ayers Elementary, Fair Oaks Elementary, Silverwood Elementary, Woodside Elementary, and Ygnacio Valley Elementary |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Robert Sidford - Director of Technology and Innovation |
|
Signed By: |
|
Melanie Koslow - Director of Maintenance and Operations |
|
Signed By: |
|
Elizabeth McClanahan - Director of Purchasing and Warehouse |
|
Signed By: |
|
Dr. Lisa Gonzales - Chief Business Officer |
|
Signed By: |
|
Dr. Adam Clark - Superintendent |
|
|
|
|
|
|
|